Alwedad Contracting Co. Ltd

Email: alwedad@alwedadsa.com,     Jeddah: +966 12 6914410,     Riyadh: +966 11 2884155
Luna Project Al-Kharj

Project Summary

The project under the MIC responsibility and part of its plan to develop local production capabilities with the assistance of German specialized company named EMT.

Client

MIC Corporation MIC Corporation

Main Contractor

Arabian Gulf Co.

Consultant

DORSCH International Consultants / KHATIB & ALAMI

Location

Al-Kharj, KSA

Scope of work

Total electro-mechanical work

Project duration

2015 - 2018

Contract Value

18,000,000$

Scope of project:

The scope of project is to produce parts for military use. Which its construction consists of Main Buildings (factory & Training Center) and Service Buildings (Truck Wash & Service Block) with Security Gates (Main & Secondary). With total build up area of 70263 m²

Significant Installation

MECHANICAL:

HVAC System

  • Installation of Chilled water system to obtain cooling for the main buildings with total capacity of 788 TR
  • Installing of Crack Units to obtain Cooling in IT & Control Rooms.

Plumbing System

  • Installing of Domestic Water Pumps to service all Wet Area of the Project.
  • Installing of Drinking Water Pumps to service Kitchens & Cafeterias Areas in Main Buildings.
  • Installing of Truck Wash Pumps.
  • Installing of Irrigation Pumps for serving all external Landscape.
  • Installing of all Toilet Fixtures & Accessories of all Buildings (Main / Secondary & Service building).

Fire Fighting System

  • Installing of Fire Pumps Sets (Diesel / Electric & jockey) for protecting Main Building with total capacity of 1000 GPM with a head of 13.5 Bar
  • Installing of Novec System & FM-200 for IT & Control Rooms in Main Buildings.
  • Installing of Automatic Fire Extinguisher in Generator Room.
  • Installing of Fire Hydrant for the External Area.

ELECTRICAL:

Medium Voltage

  • Installation of Metered RMU SM6, 13.8KV, 630A, 3-Way (1xDM1-A + 2xIM) MRMU as per SEC Standard.
  • Installation of Medium Voltage Switchgear SM6, 13.8KV, 630A, 21kA/1Sec 7-Column (6xDM1-A + 1xCM).
  • Installation Cast Resin Transformer TRIHAL Type 1600KVA (3No.) & 1000KVA (1 No.).

Low Voltage

  • Installation of Prime Generator 2250 KW, 60Hz, 400V.
  • Installation of MDB’s (Prisma Plus P) & SMDB’s (Prisma Plus P) & MSP’s (Prisma Plus P) & ATS’s & LP’s (Disbo Raw) & PP’s (Disbo Raw)
  • Installation of Low Voltage & Medium Voltage Cable XLPE/PVC
  • Installation of Duct Bank – Underground.
  • Installation of Low Voltage Feeder Busway.
  • Installation of Lighting Fixture (Interior & Exterior)
  • Installation of Wiring Devices.
  • Installation of Disconnect Switch.
  • Installation of Grounding System & Lightning Protection system.
  • Installation of Uninterruptible power supply.

Low Current

  • Installation of CCTV (IP) Security system
  • Installation of Fire Alarm & Emergency Communication System.
  • Installation of BMS (Building management system).
  • Installation of Audio Visual system.
  • Installation Data and Voice Cabling system, Communications Backbone Cabling, Communications Equipment Room Fittings
  • Installation of Access Control system.
  • Installation of Intrusion system.
ALWEDAD Contracting Co.