The project consists of three buildings (a New Accommodation building and two extension buildings to the east and west of the existing building). In addition to the utility, the building includes a pump room, generator room, and central electric room with a total build-up area of 10,325 m².
Project Brief:
Client
MODA/Air Defense Forces
Main Contractor
Direct contract
Location
Riyadh, KSA
Scope of work:
Total electro-mechanical work
Project duration
1999 - 2004
Contract Value
18,600,000$
PROJECT DETAILS
Scope of project:
Our scope in this project covers the supply, Installation, and testing of the following works:
Mechanical Works:
Provide Air conditioning to the buildings by using a combined chilled water system and rooftop package units with a total cooling capacity of 396.0 TR
Provide ventilation to the buildings through exhaust fans.
Underground piping works for; firefighting, water supply & drainage system.
Above ceiling/exposed piping & pipe risers for chilled water system & other systems
HVAC Ductwork with complete components & accessories.
Toilet fixtures and Bathroom accessories.
Plumbing Fixtures and plumbing appliances
Firefighting wet sprinkler system and FM200 systems for utility rooms.
Fire hose Cabinets and fire hydrants with all devices and accessories.
Installation of pumps with all consecutive valves and accessories
Air balancing and water balancing for HVAC system.
Building Management System.
Testing & commissioning of all mechanical systems.
Electrical Works:
Electrical Distribution equipment with a total load of 1980.22 KVA
Main Distribution panel boards with the main rating of 3008.63 Amps. and Sub-distribution boards
Installation of a stand by Generator with a total capacity of 1250 KVA