Engine Test Facility At King Abdul Aziz Air Base

Project Summary

Our scope is to provide all the electrical and mechanical facilities for the testing process facilities to operate. The complex consisted of a refined 8.5m high concrete testing building with 16m and 24m stacks. Some project premises are; a preparation room, noun facility building, and other associated facilities.

PROJECT BRIEF:

Client

Royal Saudi Air Force (RSAF)

Main Contractor

British Aerospace / Rolls Royce

Consultant

Davis Langdon

Location

King Abdulaziz Airbase Dharan Engine Test complex

Project duration

2011 - 2012

Contract Value

4,000,000$

PROJECT DETAILS

Major Installations:

  • Aeroplant.
  • MV/LV transformers.
  • M Cables + LV Cables.
  • LV electric distribution equipment.
  • Investors for distributing equipment.
  • UPS system.
  • Security System.
  • Paging System
  • Rooftop package unit.
  • Pumps.
  • Ductworks.
  • Fire protection system.
  • Plumbing works.