Alwedad Contracting Co. Ltd

Email: alwedad@alwedadsa.com,     Jeddah: +966 12 6914410,     Riyadh: +966 11 2884155

Fuel Farm Office & Technical Bldg. At KAIA 

Project Summary

The fuel farm project is a part of the leading project of King Abdul Aziz International Airport-Jeddah. Technical building located on the South-West corner of the Fuel Farm Plot, farthest from the fuel storage (well clearing the blast radius of 153m) and close to the main access gate, including the leading electrical room, supplies electricity to fuel farm facilities, also we have control & server room for monitoring, controlling purpose and administration offices. The building area of the buildings is 2000 m².

Project Brief:

Client

General Authority of Civil Aviation (GACA)

Main Contractor

SAUDI BIN LADIN GROUP.

Consultant

Dar Al Handasah

Location

Jeddah KSA

Scope of work

Total electro-mechanical work

Project duration

2015 - 2017

Contract Value

4,000,000$

PROJECT DETAILS

Scope of project:

Complete MEP works inside the building, and External underground infrastructure serves the facilities. The scope includes engineering studies and submittals like shop drawings, material selection, and submittals, AS-Built drawings, and OMM manuals for equipment.

Electrical works:

  • Supply, Install and test Low voltage cables.
  • Supply, Install and test Panelboards.
  • Installation of Lighting points.
  • Supply and Installation of Lighting Control System.
  • Supply and Installation of Central Battery System.
  • Supply and Installation of disconnect switches and socket outlets.
  • Supply and Installation of cable trays & trunks.
  • Supply and Installation of Grounding & Lightning system.
  • Testing of all electrical works.

Plumbing works:

  • Supply, Installation, and testing of underground foul water drainage (FWD) pipe complete with fitting and accessories.
  • Drainage and water supply piping works.
  • Supply and install plumbing valves.
  • Supply and install water heaters.

Fireworks:

  • Supply, Installation, Testing, and Commissioning of Fire Fighting Piping system complete with fittings (Under & above ground).
  • Supply and install fire valves.
  • The automatic fire suppression system (FM-200) includes pipes, fittings, valves, and accessories.

HVAC works:

  • Supply & Installation of Chilled water pipe complete with fittings and accessories for under and above ground.
  • Supply & Installation of condensate pipe with insulation.
  • Supply and Installation of HVAC valves.
  • Supply and Installation of Air Handling Units complete with valves and accessories.
  • Supply and Installation of Sensible cooling Units complete with valves and accessories. (Chilled Water type).
  • Supply and Installation of Fan coil Units complete with valves and accessories.
  • Supply and Installation of VAV units complete with accessories.
  • Supply and Installation of fans complete with accessories.
  • Fabrication, Supply, and Installation of Galvanized steel duct complete with fittings supports, and accessories.
  • Supply and Installation of Dampers.
  • Supply and Installation of Air outlets.
  • Supply and Installation of Sound attenuators.
  • Supply and Installation of DX units.

Signification Installation:

List all the significant Installations of the project with a brief description.

Example:

  • Installation of a power generator with a total capacity of 3125
  • Installation of a central battery system with a total capacity of 16kVA.
  • Installation of PANEL BOARDS with a primary rating of 1000 Amps
  • Installation of BMS system with total points of 420 points.

The fuel farm project is challenging since the project is critical for the operation of King Abdul Azeez International airport in Jeddah, which is considered an essential step with KINGDOM’S Ambitious Vision 2030.

ALWEDAD Contracting Co.