Alwedad Contracting Co. Ltd

Email: alwedad@alwedadsa.com,     Jeddah: +966 12 6914410,     Riyadh: +966 11 2884155

Dilapidation Survey & Completion Of Remaining Work AT Parcel 5.06, KAFD.

Project Summary

The project was executed at the request of Saudico. KAFD Parcel 5.06 Located in Riyadh with built up area of 42,717 m2.

The project consists of 14 levels dedicated for hotel areas and 5 car parking stories in the basement with available space of 189 car parking space. The parcel area is 6,118m2

Project Brief:

Client

Public Investment Fund (PIF)/KAFD Co.

Main Contractors

M/s. Saudi Constructioneers Co. (Saudico)

Consultant

JLL.

Location

King Abdullah Financial District, Riyadh.

Project Duration

January 2019 - July 2019

Contract Value

588,000$

PROJECT DETAILS

Scope of Work

Dilapidation Survey of MEP Works including engineering studies & Tests in addition to completion of remaining MEP work including supply and installation of remaining materials, testing and startup of existing installed equipment and handing over of the systems to the Client noting that the project cumulative completion was 62%, however Al WEDAD scope was covering the supply and installation and testing of the remaining works, as well as repair / dismantle / reinstall or install existing non performing or poor installations.

ALWEDAD Contracting Co.